The Schermer Building

Work progresses on the College's new science, technology, engineering, art, and nursing classroom building, named in honor of longtime GHC Chemistry instructor, administrator and Foundation board member Dr. Gene Schermer. The Schermer building will be ready for students in Fall 2015.

Timeline Photos: (click here for a live view)

October 22, 2014
October 22, 2014

September 3, 2014 09-03 | August 18, 2014 08-18 | July 15, 2014 07-15
June 16, 2014 06-16
| May20, 2014 05-20 | April 18, 2014 04-18
February 17, 2014 02-17 | January 27, 2014 01-27 | December 26, 2013 12-26

 

This aerial photo was taken May 14, 2014 from the north of campus.

Aerial view of the Schermer Building construction site.

The crane in the top middle portion of the photo is a "telescopic crawler" manufactured by Liebherr (model LTR 1060), which weighs in at 138,000 lbs. It has a lift capacity of 60 tons, a lifting height of 55 meters, and working radius of 50 meters. Not only that, it can move under load, extending the range.

 


Drawings, Reports, and Specifications
SRG Plans
SRG cd-romSRG CD: 01-25-2012

      

Download the TRUELOOK AppGreat Gift Idea: Download the App (the price is right!)

Anyone who loves GHC would be thrilled to receive the free app to connect their cell phone/i-device to the web camera at our construction site. Go to the app store and click on TRUELOOK, once you have downloaded that, our account log-in is formacc (lower case). You can receive 15-minute updates on our project, zoom in on areas of interest, or choose the setting for time-lapse.

FREE DOWNLOAD

App StoreGoogle Play

Grays Harbor College
GRAYS HARBOR COLLEGE
1620 Edward P. Smith Drive
Aberdeen , WA 98520

(360) 532-9020
or toll-free (in WA state) (800) 562-4830
Fax: (360) 538-4299

Off-Campus Locations
Riverview Education Center, Raymond: (360) 875-9466
Columbia Education Center, Ilwaco: (360) 642-9433
Whiteside Education Center, Aberdeen: (360) 533-9733